*The oven has the compact structure, small occupying, large drying area, small surface area, slight radiating heat and high thermal efficiency. * The running speed of belt net can be controlled (frequency). * The temperature can be controlled willfully and designed according to the need.
* The belt and the heat preservation use the stainless steel; it is suitable for food industry.
>>>>>>Oven Specifications
Model
DKX3
DKX5
OKX3
OKX5
Electricity(gas) consumption
28KW
42KW
5-10kg/h (gas)
15-20kg/h (gas)
Heating Temperature
0-200
0-200
0-200
0-200
Production Capacity (kg/h)
120-180
150-200
150-250
200-500
Dimension (m)
5.2*1.3*1.8
5.5*1.3*2.2
5.8*1.5*2.2
8.5*1.5*2.5
steam oven
electric oven
Different belt of Oven
* Food safe industry level:The belt and the heat preservation use the stainless steel;
* High capacity feed level:Chain skirt belt will extended the life of oven,Increase the heating area of pellets;
FAQ
1. What`s the raw material of the machine? Dingrun: Our machine`s raw material usually suit for all kinds of powder.If your raw material is not power,We will give you the best suggest according to your selected material.
2. What`s the material of your machine? Dingrun: We use all stainless steel for the parts directly with products.
3.What kind of fuels we can choose during our production? Dingrun: You can choose gas,diesel,electricity as fuels,but pls tell me your idea to me when you ask for quotation. 4.How can I get more discount? Dingrun: Please free to contact with Miss Suki Whatsapp/Cell:008618753110771 >>>>>>ORDER NOW
Our Service
>>>>>>Installation & Training
a.) The seller will send one engineer to install the machinery. b.) Buyer is responsible for finding a translator locally for easy understanding. c.) The buyer will be asked to provide room, board, round-trip transportation,visa, and a nominal $50-$80 daily subsidy per person for their working days. d.) Period of installation:The buyer should arrange at least 4 workers including one electric technician to help our engineer for installation. The raw material, workshop electric source should be well prepared before installation. On base of the above request, the installation period is7-14 days including training the operater. A possible delay of the installation period will be additionally invoiced.